Why are there 2 connections for the Live supply?
Vesternet Z-Wave High Load Switch
Question ID: 4855910 Status:
Open Mar 01, 2024 - 08:00 AM
1answer
Answer
Mar 01, 2024 - 09:00 AM
In order to support high loads of up to 16A both connections should be wired to the Live supply..
View More Product Details
Vesternet Z-Wave High Load Switch
Power, Energy, Voltage & Current Metering Keep track of how much power your appliances are using, allowing you to fine tune their control in order to reduce your monthly energy costs High Load Capacity Supports up to a maximum 16A capacity loads Momentary or Toggle Switches Can be configured to ...
See More
View Details
View all Vesternet Z-Wave High Load Switch Questions & Answers
Add New Comment